|
| NDP hopes for Calgary breakthrough |  |
| "Ed Stelmach sold us out on royalties" Should the NDP form the government following tomorrow`s provincial vote, leader Brian Mason pledged $100 million to build a research centre in Calgary aimed at developing green energy technologies. via Edmonton Sun |
|
| GE and RES Sign $700 Million Deal |  |
| Renewable Energy Systems (RES) Americas Inc. has signed agreements worth more than US $700 million to receive GE Energy 1.5-megawatt (MW) wind turbines for projects in 2009 and 2010. GE Energy will supply RES with nearly 500 MW of new wind energy capacity, and will provide commissioning and operations services as well as maintenance support. |
|
|
|
|
| Geothermal Gains Steam in India |  |
| Nordic bank Glitnir and the Bhilwara Group have finalized terms on a previously reported deal to develop geothermal energy projects in India and Nepal. Glitnir has secured a 60:40 partnership LNJ Bhilwara Group. |
|
| Tetra Tech Signs $150 Million in Deals |  |
| Tetra Tech, Inc. has announced that it has been awarded three wind energy projects totaling approximately US $150 million by PacifiCorp. Work on the three projects will begin immediately and is expected to be complete in December 2008. Tetra Tech will provide engineering, procurement, and construction (EPC) services for the Seven Mile Hill, Glenrock and Rolling Hills wind farm projects in Wyoming. |
|
| Wind Power |  |
|
|
| Wind Power Monopoly Feared |  |
|
|
| Testing the Limits of Solar Power |  |
| Swiss company Sputnik Engineering has committed to ramping up production of its SolarMax inverters to 400 megawatts (MW) of capacity by the end of 2008. The ambitious target comes as the company is also about to open a new manufacturing facility in Port, Switzerland in March. |
|
| Excessive Permit Fees Hinder Renewable Energy Development |  |
| Most cities in the Rocky Mountain front range surrounding Denver are not doing much to stimulate Governor Ritter`s, "New Energy Economy." Homeowners in the city of Lakewood, Colorado are charged $761 in permit related fees when investing in a 3 kilowatt (kW) PV system for their home. In Aurora, Colorado permit related fees are $1,350 for a 3.2 kW system. Those costs are equal to several years of those investor`s energy savings. In contrast, Denver residents, installing the same size systems, pay a total of about $100, less than 3 months worth of energy savings. |
|
| Wind turbines encounter opposition from communities |  |
| "It`s not based on distance but on the sound level" Earnest Marshall has been driven out of the home he`s lived in for the past 30 years by his noisy, intrusive neighbour. via Slam Sports |
|
| Media Advisory: Key Hydropower Policy Events at WIREC 2008 |  |
| The National Hydropower Association (NHA), which represents America`s largest and longest-serving renewable energy sector, is pleased to welcome international delegates, industry leaders from throughout the world, and members of the media to the Washington International Renewable Energy Conference (WIREC).
NHA is joining other hydropower organizations, as well as representatives from financial, environmental, and other groups in several key events throughout the conference. |
|
| WIREC Shows the Potential - and Support for - Hydropower and Other Renewables |  |
| The National Hydropower Association (NHA) is pleased to welcome delegates from around the globe to the Washington International Renewable Energy Conference (WIREC). As the trade association that represents America`s largest and longest-serving renewable energy resource, NHA supports international efforts to bring new renewable energy technologies to market that can provide reliable, affordable electricity, while also offering environmental and economic benefits. |
|
|
|
report some news for our community
RSS feed
subscribe me
|